Bank of Jiujiang Wuhan Data Center: 10.5KV-3 1800KW high pressure units parallel
Classification:
Financial field
Case Description
Bank of Jiujiang Wuhan Data Center: 10.5KV-3 1800KW high pressure units parallel
The Bank of Jiujiang Wuhan Data Center utilizes a series of 10.5KV-3 1800KW high-pressure units configured in parallel, ensuring a stable and efficient power supply for the center’s critical operations. These units, designed for high performance and reliability, are integral to the data center’s power infrastructure, supporting its high-demand energy requirements. The parallel setup maximizes operational continuity, allowing for seamless load distribution and reducing the risk of power interruptions. Each unit is equipped with advanced protection and monitoring systems that provide real-time performance data, enabling proactive maintenance and fault prevention. This setup not only ensures high energy efficiency but also enhances the data center's overall capacity to scale with the growing demands of digital banking services. With this power system, the Bank of Jiujiang can maintain optimal uptime and meet the stringent demands of its data-driven operations.